At Kiaal Kuwait, we provide on-site measurement of Sigma works on all external facades and boundary walls, following the standards used in the Kuwaiti market. The measurement is the same in every case, but the report is prepared according to your goal: purchasing and pricing before execution, or settlement after execution.
Pre-Execution Survey (For Purchasing)
Ideal for owners who need to know how much of each color to buy and want to request quotations, and for contractors pricing the work accurately.
- A detailed breakdown of Sigma areas by color and code
- The quantity needed for each color, so materials are purchased accurately with no shortage or excess
- A clear report that helps compare quotations based on defined quantities
Post-Execution Survey (For Settlement)
Ideal for owners, contractors and Sigma applicators settling payments for the works actually executed.
- Measurement of all executed Sigma works by square meter
- Opening deductions according to the technical standards approved in Kuwait
- All items calculated according to technical standards, the contract, or common practice
- A report ready for settlement showing quantities, deductions and net totals for each item
Survey Items
- External facades Sigma (m²): front, rear and side facades in full
- Color breakdown (m²): a separate quantity for each color and code
- Neighbor-side walls & boundary walls (m²): walls and boundary walls to be finished with Sigma
- Opening deductions: doors and windows deducted according to the technical standards approved in Kuwait
- Other items: any executed works as per the contract or common practice
Benefits for the Owner (Homeowner)
- Buy the right quantity of each color, with no shortage that stops the work and no excess that wastes money
- Know the actual cost of Sigma works before execution begins
- Request quotations based on defined quantities and compare them accurately
- Pay the contractor only for the actual executed quantities
Benefits for the Contractor & Sigma Applicator
- Submit a quotation based on real quantities, protecting against losses or losing the project
- Claim payment with documented, neutral quantities
- Ensure every executed facade and color is counted
- Avoid disputes over the final bill
What You Receive
- An organized PDF report arranged by facade and color
- Amount due calculated at the agreed unit rates for settlement surveys
The Result: accurate, documented quantities, whether for purchasing or settlement, that protect all parties.