Kiaal Kuwaitكيال الكويت

Our services

Curtain Wall Survey

Accurate on-site measurement of curtain wall areas on external facades before or after installation, documented in a detailed facade-by-facade report.

At Kiaal Kuwait, we provide on-site measurement of curtain wall (glass facade) works on all external facades of the building, following the standards used in the Kuwaiti market. The measurement is the same in every case, but the report is prepared according to your goal: pricing before execution, or settlement after installation.

Pre-Execution Survey

Measurements can be taken at any stage after blockwork, whether before or after finishing works. Ideal for owners requesting quotations from curtain wall companies, and for contractors pricing the work accurately.

  • A detailed breakdown of curtain wall areas by facade and location
  • A clear report that helps compare companies' quotations based on defined quantities

Post-Execution Survey (For Settlement)

Ideal for owners, contractors and curtain wall companies settling payments for the works actually installed.

  • Measurement of all installed curtain wall works by square meter
  • All items calculated according to technical standards, the contract, or common practice
  • A report ready for settlement showing quantities and net totals for each item

Survey Items

  • Curtain wall (m²): all external glass facades of the building
  • Facade-by-facade breakdown: front, rear, side and any other facades
  • Additional items: any related executed works as per the contract or common practice

Benefits for the Owner (Homeowner)

  • Know the actual cost of curtain wall works before contracting
  • Request quotations from companies based on defined quantities and compare them accurately
  • Pay the company only for the actual installed quantities
  • Avoid inflated quantities and surprises in the final bill

Benefits for the Contractor & Curtain Wall Companies

  • Submit a quotation based on real quantities, protecting against losses or losing the project
  • Claim payment with documented, neutral quantities
  • Present a clear, convincing offer that builds the owner's trust and increases the chance of winning the job
  • Avoid disputes over the final bill

What You Receive

  • An organized PDF report arranged by facade and location
  • Amount due calculated at the agreed unit rates for settlement surveys

The Result: accurate, documented quantities, whether for pricing or settlement, that protect all parties.

Testimonials

What our clients say

5.0 · 1 reviews
ابو عبدالرحمن October 2026 · Internal Plastering Survey

Verified client

الاستاذ ماجد ذو كفاءه وسرعه ودقه في المواعيد والكيال الله يجزاه خير

Ready? Move forward with confidence

Contact us now and we'll be at your site as soon as possible.