At Kiaal Kuwait, we provide on-site measurement of external landscape paving, whether outdoor tiles, interlock, curbstones or any other material, covering all yards and external walkways, following the standards used in the Kuwaiti market. The measurement is the same in every case, but the report is prepared according to your goal: purchasing and pricing before execution, or settlement after execution.
Pre-Execution Survey (For Purchasing)
Ideal for owners who need to know how much material to buy and want to request quotations, and for contractors pricing the work accurately.
- A detailed breakdown of paving areas and curbstone lengths for each yard and area
- The actual purchase quantity for each material, with no shortage or excess
- A clear report that helps compare supplier and contractor quotations based on defined quantities
Post-Execution Survey (For Settlement)
Ideal for owners, contractors and landscape subcontractors settling payments for the works actually executed.
- Measurement of all executed works by square meter and linear meter
- Deductions calculated according to the technical standards approved in Kuwait
- All items calculated according to technical standards, the contract, or common practice
- A report ready for settlement showing quantities, deductions and net totals for each item
Survey Items
- Outdoor tiles (m²): yard floors and external walkways
- Interlock (m²): interlock areas in yards, parking spaces and walkways
- Curbstones (l.m): edges of yards, walkways and green areas
- Front sidewalk curbstones (l.m): the plot's front sidewalk
- Other items: any executed landscape works as per the design, the contract or common practice
Benefits for the Owner (Homeowner)
- Buy the right quantity of materials, with no shortage that stops the work and no excess that wastes money
- Know the actual cost of landscape works before execution begins
- Request quotations based on defined quantities and compare them accurately
- Pay the contractor only for the actual executed quantities
Benefits for the Contractor & Landscape Subcontractor
- Submit a quotation based on real quantities, protecting against losses or losing the project
- Claim payment with documented, neutral quantities
- Ensure every executed area and length is counted
- Avoid disputes over the final bill
What You Receive
- An organized PDF report arranged by yard and item type
- Amount due calculated at the agreed unit rates for settlement surveys
The Result: accurate, documented quantities, whether for purchasing or settlement, that protect all parties.